Development

Sports Hall Development

A 3-court Sports Hall has been constructed, within the walled garden just off the main drive.

The new Sports Hall has a multi-gym, full changing and shower facilities, Drama room and climbing wall. On the first floor there are 7 new modern classrooms.

The Hall will not only be capable of providing the sports facilities, but will also be used for events and theatre/drama productions.
» view gallery

The Lindens Building (Junior School)

The development will include enclosing the current open air courtyard, with a bespoke glazed atrium construction, made from traditional material, and designed to be in keeping with the historic nature of the Lindens building.

This area will provide a more secure environment that will be used as a dining room and assembly for the Junior School.

The current entrance to the stables will be fully enclosed with a reception area to provide a warm and welcoming reception to the school.

Outside the front of the building, a new play area will be formed, and the car parking/vehicular circulation moved away from the immediate area to provide better circulation and safety.
» view gallery

Upton Hall (Senior School)

A new bespoke glazed conservatory has been constructed within the existing courtyard area of the school.

This has been made from traditional materials and designed to be sympathetic to the Grade I listed Upton Hall.

This area provides a new dining hall, over twice the size of the previous dining facility, thereby providing a much more relaxed area for our pupils to dine in.
» view gallery

Quality       Harmony       Success

Quinton House School, Upton Hall, Upton, Northampton NN5 4UX